Albertsons Companies Inc's Business Segments
Albertsons Companies Inc's reported revenue by business segment and by geographic region, quarterly and annual, normalized against the consolidated income statement. Free below: the top 3 rows per table, this quarter and this fiscal year. Subscriber access adds the full segment history and operating income by segment.
Revenue Share by Reportable Segment - FY
- Reportable30%
- Non-perishables14.3%
- Fresh9.5%
- Pharmacy4%
- Fuel1.8%
- Other Products and Services0.5%
Revenue by Reportable Segment - FY
| Segment | Revenue (Millions) | % of Total |
|---|---|---|
| Reportable | $ 24,942 | 30% |
| Non-perishables | $ 11,876 | 14.3% |
| Fresh | $ 7,883 | 9.5% |
Sign in to unlock the full Albertsons Companies Inc dataset.
Annual Results
Revenue Share by Reportable Segment - FY
- Reportable30%
- Non-perishables14.3%
- Fresh9.5%
- Pharmacy4%
- Fuel1.8%
- Other Products and Services0.5%
Revenue by Reportable Segment - FY
| Segment | Revenue (Millions) | % of Total |
|---|---|---|
| Reportable | $ 24,942 | 30% |
| Non-perishables | $ 11,876 | 14.3% |
| Fresh | $ 7,883 | 9.5% |
Sign in to unlock the full Albertsons Companies Inc dataset.
Description of Albertsons Companies Inc
Surface Mining. We use surface mining when coal is found close to the surface.
Surface mining involves removing the topsoil then drilling and blasting the
overburden (earth and rock covering the coal) with explosives. We then remove
the overburden with heavy earth-moving equipment, such as draglines, power shovels,
excavators and loaders. Once exposed, we drill, fracture and systematically
remove the coal using haul trucks or conveyors to transport the coal to a preparation
plant or to a loadout facility. We reclaim disturbed areas as part of our normal
mining activities. After final coal removal, we use draglines, power shovels,
excavators or loaders to backfill the remaining pits with the overburden removed
at the beginning of the process. Once we have replaced the overburden and topsoil,
we reestablish vegetation and plant life into the natural habitat and make other
improvements that have local community and environmental benefits.
Underground Mining. We use underground mining methods when coal is located
deep beneath the surface. We have included the identity and location of our
underground mining operations below under “Our Mining Operations-General.”
Our underground mines are typically operated using one or both of two different
mining techniques: longwall mining and room-and-pillar mining.
Longwall Mining. Longwall mining involves using a mechanical shearer to extract
coal from long rectangular blocks of medium to thick seams. Ultimate seam recovery
using longwall mining techniques can exceed 75%. In longwall mining, continuous
miners are used to develop access to these long rectangular coal blocks. Hydraulically
powered supports temporarily hold up the roof of the mine while a rotating drum
mechanically advances across the face of the coal seam, cutting the coal from
the face. Chain conveyors then move the loosened coal to an underground mine
conveyor system for delivery to the surface. Once coal is extracted from an
area, the roof is allowed to collapse in a controlled fashion.
Room-and-Pillar Mining. Room-and-pillar mining is effective for small blocks of thin coal seams. In room-and-pillar mining, a network of rooms is cut into the coal seam, leaving a series of pillars of coal to support the roof of the mine. Continuous miners are used to cut the coal and shuttle cars are used to transport the coal to a conveyor belt for further transportation to the surface. The pillars generated as part of this mining method can constitute up to 40% of the total coal in a seam. Higher seam recovery rates can be achieved if retreat mining is used. In retreat mining, coal is mined from the pillars as workers retreat. As retreat mining occurs, the roof is allowed to collapse in a controlled fashion.
Coal Preparation and Blending. We crush the coal mined from our Powder River Basin mining complexes and ship it directly from our mines to the customer. Typically, no additional preparation is required for a saleable product. Coal extracted from some of our underground mining operations contains impurities, such as rock, shale and clay occupying a wide range of particle sizes. All of our mining operations in the Appalachia region use a coal preparation plant located near the mine or connected to the mine by a conveyor. These coal preparation plants allow us to treat the coal we extract from those mines to ensure a consistent quality and to enhance its suitability for particular end-users. In addition, depending on coal quality and customer requirements, we may blend coal mined from different locations, including coal produced by third parties, in order to achieve a more suitable product.
Powder River Basin
Black Thunder. Black Thunder is a surface mining complex located on approximately
35,800 acres in Campbell County, Wyoming. The Black Thunder complex extracts
thermal coal from the Upper Wyodak and Main Wyodak seams.
We control a significant portion of the coal reserves through federal and state
leases. The Black Thunder mining complex had approximately 896.4 million tons
of proven and probable reserves at December 31, 2017. The air quality permit
for the Black Thunder mine allows for the mining of coal at a rate of 190 million
tons per year. Several large tracts of coal adjacent to the Black Thunder mining
complex have been nominated for lease, and other potential large areas of unleased
coal remain available for nomination by us or other mining operations. The U.S.
Department of Interior Bureau of Land Management, which we refer to as the BLM,
will determine if the tracts will be leased and, if so, the final boundaries
of, and the coal tonnage for, these tracts.
The Black Thunder mining complex currently consists of four active pit areas
and three loadout facilities. We ship all of the coal raw to our customers via
the Burlington Northern Santa Fe and Union Pacific railroads. We do not process
the coal mined at this complex. Each of the loadout facilities can load a 15,000-ton
train in less than two hours.
Coal Creek. Coal Creek is a surface mining complex located on approximately
7,400 acres in Campbell County, Wyoming. The Coal Creek mining complex extracts
thermal coal from the Wyodak-R1 and Wyodak-R3 seams.
We control a significant portion of the coal reserves through federal and state
leases. The Coal Creek mining complex had approximately 128.4 million tons of
proven and probable reserves at December 31, 2017. The air quality permit for
the Coal
Creek mine allows for the mining of coal at a rate of 50 million tons per year.
The Coal Creek complex currently consists of one active pit area and a loadout
facility. We ship all of the coal raw to our customers via the Burlington Northern
Santa Fe and Union Pacific railroads. We do not process the coal mined at this
complex. The loadout facility can load a 15,000-ton train in less than three
hours.
Metallurgical
Mountain Laurel. Mountain Laurel is an underground mining complex located on
approximately 38,200 acres in Logan County and Boone County, West Virginia.
Underground mining operations at the Mountain Laurel mining complex extract
High-vol B metallurgical coal from the Cedar Grove and Alma seams. The Mountain
Laurel mining complex has approximately 21.1 million tons of proven and probable
reserves at December 31, 2017.
We process all of the coal through a 1,400-ton-per-hour preparation plant before
shipping the coal to our customers via the CSX railroad. The loadout facility
can load a 15,000-ton train in less than four hours.
Beckley. The Beckley mining complex is located on approximately 19,700 acres
in Raleigh County, West Virginia. Beckley is extracting high quality, low-volatile
metallurgical coal in the Pocahontas No. 3 seam. The Beckley mining complex
had approximately 25.4 million tons of proven and probable reserves at December
31, 2017.
Coal is belted from the mine to a 600-ton-per-hour preparation plant before
shipping the coal via the CSX railroad. The loadout facility can load a 10,000-ton
train in less than four hours.
Sentinel. The Sentinel mining complex consists of one underground mine, a preparation
plant and a loadout facility located on approximately 25,700 acres in Barbour
County, West Virginia. Mining operations currently extract High-vol A metallurgical
coal from the Clarion coal seam. Coal from the Sentinel mining complex is processed
through the preparation plant and shipped by CSX rail to customers. The Sentinel
mining complex had approximately 4.7 million tons of proven and probable reserves
at December 31, 2017.
Leer. The Leer Complex, located in Taylor County, West Virginia, includes approximately
30.8 million tons of coal reserves as of December 31, 2017 and has primarily
High-vol A metallurgical quality coal in the Lower Kittanning seam, and is part
of approximately 82,300 acres that is considered our Tygart Valley area. Substantially
all of the reserves at Leer are owned rather than leased from third parties.
All the production is processed through a 1,400 ton-per-hour preparation plant
and loaded on the CSX railroad. A 15,000-ton train can be loaded in less than
four hours.
Other Thermal
West Elk. West Elk is an underground mining complex located on approximately
19,500 acres in Gunnison County, Colorado. The West Elk mining complex extracts
thermal coal from the E seam.
We control a significant portion of the coal reserves through federal and state
leases. The West Elk mining complex had approximately 53.1 million tons of proven
and probable reserves at December 31, 2017.
The West Elk complex currently consists of a longwall, continuous miner sections
and a loadout facility. We ship most of the coal raw to our customers via the
Union Pacific railroad. The loadout facility can load an 11,000-ton train in
less than three hours.
